ASAHI Zinc alloy pillow block ball bearing KP000 KP001 KP002 KP003 KP004 KP005 KP006
The Brief Description of ASAHI Zinc Alloy Pillow Block Bearings:
Small Zinc pillow block bearing is a new type of bearing, to join other elements for zinc based alloy bearing.Often add alloy elements are aluminum, copper, magnesium, cadmium, lead, titanium, etc.
Zinc base alloy low melting point, good liquidity, easy fusion welding, brazing and plastic processing, in the atmosphere corrosion, deformed material easy to recycle and remelting;But low creep strength, prone to natural aging changes size.The melting method, die casting and pressure processing timber.According to the manufacturing process can be divided into cast zinc-base alloy and deformation of zinc base alloy.
Stock List of KP series pillow block bearing:
Unit No. | Shaft d | Dimensions (mm) | Bolt Size mm | Bearing No. | Housing No. | Weight | |||||||||
(mm) | H | J | A2 | A1 | A | N | L | s | Z | A3 | (kg) | ||||
KP000 | 10 | 18 | 67 | 53 | 16 | 6 | 35 | 7 | 4 | 14 | 28.3 | M6 | K000 | P000 | 0.03 |
KP001 | 12 | 19 | 71 | 56 | 16 | 6 | 38 | 7 | 4 | 14.5 | 30 | M6 | K001 | P001 | 0.04 |
KP002 | 15 | 22 | 80 | 63 | 16 | 7 | 43 | 7 | 4.5 | 16.5 | 33 | M6 | K002 | P002 | 0.05 |
KP003 | 17 | 24 | 85 | 67 | 18 | 7 | 47 | 7 | 5 | 17.5 | 36 | M6 | K003 | P003 | 0.07 |
KP004 | 20 | 28 | 100 | 80 | 20 | 9 | 55 | 10 | 6 | 21 | 40 | M8 | K004 | P004 | 0.11 |
KP005 | 25 | 32 | 112 | 90 | 20 | 10 | 62 | 10 | 6 | 22.5 | 41 | M8 | K005 | P005 | 0.15 |
KP006 | 30 | 36 | 132 | 106 | 26 | 11 | 70 | 13 | 6.5 | 24.5 | 43 | M10 | K006 | P006 | 0.21 |
Bearings Package:
Original Package:
1):Inner Plastic Bag+ Paper Box + Carton(+Pallet);
2):Small sizes:Plastic Tube + Carton
3):Big sizes:Wooden Case
Bearings Lead time:
We will prepare your order as soon as possible.
1)2-3 days for ex-stock
2)6-10 days for others
Shipping & Delivery time:
1)Less than 45 Kg:DHL TNT Fedex UPS express will be better,( 4-7 days delivered to your address);
2) Between 45 to 200 Kg:Air transiportation will be better,( 5-14 days delivered to your airport);
3) Over 200 Kg:Sea transportation will be better.( Cheapest,18-45 days to your port ).
Payment terms:
We accept T/T, Western Union,Paypal,Visa.
1) T/T or WU (we undertake the bank fees):
A:100% payment.
B:30% deposit ,70% before transportation.
2)PayPal (we undertake the transaction fees) :
A:100% payment.
B:30% deposit ,70% before transportation.
3) L/C at sight.